GRTA Xpress Operations & Maintenance Facility

The Georgia Regional Transportation Authority’s new Express Operations and Maintenance Facility was constructed to provide crucial operational space for its growing bus fleet, integrate more sustainability and energy efficient technologies, and provide state-of-the-art offices and meeting spaces.  Stevens & Wilkinson worked with the Georgia Regional Transportation Authority to design 12 maintenance bays, six drive through

Read full article »

Electric Guard Dog

Electric Guard Dog is a company that provides theft deterrent services to a variety of businesses throughout the country. By integrating new technologies into their electric security fence system, Electric Guard Dog has become a leading voice in the security market. The new headquarters for Electric Guard Dog is located on the fifth floor of the

Read full article »

Pedestrian Crossings-Terminal to Garages

The goal of this project is to provide safe pedestrian access from the existing park-ing decks to the main terminal, to eliminate pedestrian traffic across the upper level roadways from the parking decks to the terminal and to accommodate the anticipated increase in pedestrian traffic at the airport through the year 2030. Programmatically, new elevator

Read full article »

Hartsfield-Jackson Atlanta International Airport – Concourse F – International Terminal Upgrades

The project for the new International Terminal (Concourse F) at Hartsfield-Jackson Atlanta International Airport included designing new office spaces and service areas for the five international airlines that will be the terminal’s new tenants. It was important to the owner that these new spaces provide a safe, efficient and comfortable working environment for tenants and

Read full article »

Peachtree at 17th

This project consists of two separate buildings that are part of a large mixed-use developments located in the heart of Midtown Atlanta. Situated at the corner of Peachtree and 17th Streets, a 46-story tower containing residential and hospitality elements will flank the corner of the site. Connected to this building via a gallery transitional element

Read full article »

The Westminster Schools Pressly Hall Renovations

The Westminster Schools Pressly Hall Renovations encompassed the renovation of Pressly Hall’s three stacked levels. Project Goals were to update the following three areas: Office of Institute Advancement (OIA), College Counseling and Student Counseling departments. The renovation reflects Westminster’s desire to obtain more open, modern spaces that reflect their pedagogy as an institution. This goal was achieved by creating inviting spaces with the flexibility to

Read full article »

Ronald E. McNair Middle School Replacement

The Ronald E. McNair Middle School is Fulton County Schools’ first example of a facility design based on the principles of project-based Immersive Learning. By introducing Immersive Learning concepts and further developing district-specific ideas originally presented in a two-day charrette, Stevens & Wilkinson and Immersive Learning consultant, LITTLE, transformed the conventional wing design of their previous

Read full article »

Brookland-Cayce High School Stadium

Originally designed in 1929, Brookland-Cayce High School has since undergone a series of additions and renovations. Recent improvements include a new cafeteria and kitchen addition, fine arts and media center wing, various classroom renovations, athletic facilities upgrades, and a new state-of-the-art 5,000-seat athletic arena. The design architect for this project is Jumper Carter Sease. Stevens &

Read full article »

Bamberg District Two High School Renovation and New Pre-K-8 Elementary/Middle School

Stevens & Wilkinson was hired by Bamberg County School District Two to provide Pre-Bond Referendum Conceptual Design Studies that would enable the District to renovate their pre-existing high school and construct a new Pre-K-8 facility and School District Administration and Maintenance offices. The goal – create a combined Pre-K-12 campus, or school facility, with accompanying baseball,

Read full article »

Fulton County Schools Media Center Renovations

Stevens & Wilkinson recently completed the interior redesign of Fulton County Schools 14 existing high school media centers, all based on a newly adopted space criteria that acknowledged the changing role of media centers in high schools. Design elements include new furniture, improved technology, updated finishes, and the re-configuration of staff and student spaces that create

Read full article »
  • Like Us on Facebook
  • Connect on LinkedIn
  • Follow us on Google+